Composite doors › Glasgow City
Composite doors supplied to Glasgow City
Yes — composite front doors are supplied to Glasgow City supply only as a complete door set: slab, frame, hinges, lock, cylinder and handle, made to your opening and delivered in about a week rather than 8–12 weeks.
72 designs, made to your opening sizes and delivered 3–5 working days once made into Glasgow City — 317 road miles from where they are built. Installation available and priced separately.
Specification
| Leaf thickness | 44mm |
| Core | Solid timber, laminated |
| Skin | GRP, woodgrain or smooth |
| Frame | Reinforced uPVC or aluminium |
| Locking | Multipoint, TS007 1-star cylinder as standard |
| U-value | Typically 1.0–1.4 W/m²K for the door set |
| Guarantee | 10 years on the slab, 10 on hardware |
| Designs held | 72 |
| Delivery to Glasgow City | Zone E — 3–5 working days once made |
Why this suits Glasgow City
A composite door does not warp like timber or go chalky like early uPVC, which is why it is the default replacement front door across Glasgow City.
Sandstone tenements, interwar and postwar estates, and modern flats. High rainfall with real wind load off the Atlantic approaches. The failure that tends to come first is Rot in original timber sashes and damp in solid sandstone walls — worth knowing before you decide between repairing what you have and replacing it.
Scottish building standards differ from England and Wales — confirm the target U-value before ordering. Order to the structural opening, measured in three places, smallest figure wins. How to measure properly.
Delivered across Glasgow City
Every postcode in Glasgow City is covered — delivery detail for Glasgow City.
Also supplied to Glasgow City
Composite doors in Glasgow City — questions
Do you install in Glasgow City?
Installation is available and quoted as a separate line, so you can see exactly what the fitting costs against the product. The product still arrives on the supply-only lead time; the fitting date depends on the diary.
What size do I order to?
The structural opening — brick to brick, lintel to cill. Measure in three places and use the smallest figure. Do not take a fitting tolerance off yourself; that is done at our end.
What usually needs replacing in Glasgow City?
Rot in original timber sashes and damp in solid sandstone walls. That is the pattern across most of the county, though an individual property can differ.
Can I get a price without giving you my details?
Prices are published on the product pages with an inc and ex VAT switch. For your exact sizes we need to price it, but you can see the range before you speak to anyone.
What if the delivery is damaged?
Check it on the vehicle and note anything on the paperwork before the driver leaves. Damage reported at that point is replaced; damage found a fortnight later is much harder to resolve.