Bi-fold doorsRutland

Bi-fold doors supplied to Rutland

Yes — aluminium bi-fold doors are supplied to Rutland supply only in 2 to 5 panes, made to your structural opening and delivered in about a week rather than the 8–12 weeks the trade usually quotes. Installation available separately.

14 designs, made to your opening sizes and delivered 1–2 working days once made into Rutland — 67 road miles from where they are built. Installation available and priced separately.

Supply only in about a weekInstallation availableAny RAL colourNationwide deliveryTrade and retail

Specification

Configuration2 to 5 panes, any opening split, in or out opening
SightlineApprox. 100–120mm on a mid-stile
Running gearTop-hung stainless rollers
ThresholdWeathered or low-threshold rebated
Glazing28mm toughened sealed unit
Max leafApprox. 1200mm wide, 2500mm high
Guarantee10 years frame, 10 years sealed unit
Designs held14
Delivery to RutlandZone B — 1–2 working days once made

Why this suits Rutland

Bi-folds fold the whole opening away, which is why they suit the rear extensions that dominate improvement work in Rutland. Worth knowing: they stack, so you lose the leaf width off the reveal.

Ironstone and limestone cottages and Georgian market-town stock. Sheltered inland. The failure that tends to come first is Rot in stone-mullioned timber casements — worth knowing before you decide between repairing what you have and replacing it.

Very extensive conservation coverage for such a small county. Order to the structural opening, measured in three places, smallest figure wins. How to measure properly.

Delivered across Rutland

Every postcode in Rutland is covered — delivery detail for Rutland.

Bi-fold doors in Rutland — questions

Can I get a price without giving you my details?

Prices are published on the product pages with an inc and ex VAT switch. For your exact sizes we need to price it, but you can see the range before you speak to anyone.

What if the delivery is damaged?

Check it on the vehicle and note anything on the paperwork before the driver leaves. Damage reported at that point is replaced; damage found a fortnight later is much harder to resolve.

How long does delivery to Rutland take?

About a week from order for standard products in standard finishes, then 1–2 working days once made for the run to Rutland. Special RAL colours and made-to-measure joinery take longer, and you get a firm date before you pay.

Do you install in Rutland?

Installation is available and quoted as a separate line, so you can see exactly what the fitting costs against the product. The product still arrives on the supply-only lead time; the fitting date depends on the diary.

What size do I order to?

The structural opening — brick to brick, lintel to cill. Measure in three places and use the smallest figure. Do not take a fitting tolerance off yourself; that is done at our end.

Send us your sizes.

A written price, a real date, and no one turning up at your house.

Call WhatsApp Get a price