DeliveryCambridgeshire

Aluminium windows and doors delivered to March

Yes — we deliver supply-only aluminium windows and doors to March. It is 108 road miles from our Birmingham unit, which puts it in Zone C: 2–3 working days once made. Everything is made to your opening sizes first; there is no survey and no appointment.

March is 108 road miles from the unit in Birmingham, which puts it in Zone C for delivery. March is in Cambridgeshire — stock here is largely fenland brick cottages, Victorian and Edwardian terraces, and substantial new-build growth.

Supply only in about a weekInstallation availableAny RAL colourNationwide deliveryTrade and retail

Delivering to March

Road distance from our unit108 miles
Delivery bandZone C — 2–3 working days once made
PostcodesPE15
CountyCambridgeshire
CollectionCollection is a long day — most people take delivery

What that means if you are ordering from March

The driest region in the UK, with exposed fenland wind. What tends to go first around here: Ground movement on shrinkable clay and fen peat distorting openings

Order to the structural opening — brick to brick, lintel to cill — measured in three places, using the smallest figure. Do not deduct a fitting tolerance yourself; that happens at our end. The full measuring method.

On a supply-only order you notify building control yourself and pay their fee. There is no FENSA or CERTASS certificate because no registered installer was involved — what that means when you sell the house. Settlement is a genuine issue on peat — re-measure at the point of order, not from old drawings.

Delivery to March — questions

Can I get a price without giving you my details?

Prices are published on the product pages with an inc and ex VAT switch. For your exact sizes we need to price it, but you can see the range before you speak to anyone.

What if the delivery is damaged?

Check it on the vehicle and note anything on the paperwork before the driver leaves. Damage reported at that point is replaced; damage found a fortnight later is much harder to resolve.

How long does delivery to March take?

About a week from order for standard products in standard finishes, then 2–3 working days once made for the run to March. Special RAL colours and made-to-measure joinery take longer, and you get a firm date before you pay.

Do you install in March?

Installation is available and quoted as a separate line, so you can see exactly what the fitting costs against the product. The product still arrives on the supply-only lead time; the fitting date depends on the diary.

What size do I order to?

The structural opening — brick to brick, lintel to cill. Measure in three places and use the smallest figure. Do not take a fitting tolerance off yourself; that is done at our end.

Send us your sizes.

A written price, a real date, and no one turning up at your house.

Call WhatsApp Get a price