Aluminium doorsShetland

Aluminium doors supplied to Shetland

Yes — aluminium entrance, French and Crittall-style doors are supplied to Shetland supply only, made to your structural opening and delivered in about a week against an industry norm of 8–12 weeks. Fitting is available separately.

66 designs, made to your opening sizes and delivered 3–5 working days once made into Shetland — 662 road miles from where they are built. Installation available and priced separately.

Supply only in about a weekInstallation availableAny RAL colourNationwide deliveryTrade and retail

Specification

LeafThermally broken aluminium, 60–70mm
LockingMultipoint, TS007 rated cylinder
ThresholdLow-threshold and Part M compliant options
FinishPolyester powder coat, any RAL, dual colour available
Glazing28mm toughened sealed unit
SecurityPAS 24 tested constructions available
Guarantee10 years on the leaf and frame
Designs held66
Delivery to ShetlandZone E — 3–5 working days once made

Why this suits Shetland

An aluminium door holds its shape where a timber one moves and a uPVC one sags. In Shetland the practical gain is on the most severe wind exposure in the uk.

Stone-built croft housing and modern island stock. The most severe wind exposure in the UK, with constant salt loading. The failure that tends to come first is Wind load, driven rain and corrosion on every elevation — worth knowing before you decide between repairing what you have and replacing it.

Freight to Shetland is a long separate leg — plan well ahead. Order to the structural opening, measured in three places, smallest figure wins. How to measure properly.

Delivered across Shetland

Every postcode in Shetland is covered — delivery detail for Shetland.

Aluminium doors in Shetland — questions

What if the delivery is damaged?

Check it on the vehicle and note anything on the paperwork before the driver leaves. Damage reported at that point is replaced; damage found a fortnight later is much harder to resolve.

How long does delivery to Shetland take?

About a week from order for standard products in standard finishes, then 3–5 working days once made for the run to Shetland. Special RAL colours and made-to-measure joinery take longer, and you get a firm date before you pay.

Do you install in Shetland?

Installation is available and quoted as a separate line, so you can see exactly what the fitting costs against the product. The product still arrives on the supply-only lead time; the fitting date depends on the diary.

What size do I order to?

The structural opening — brick to brick, lintel to cill. Measure in three places and use the smallest figure. Do not take a fitting tolerance off yourself; that is done at our end.

What usually needs replacing in Shetland?

Wind load, driven rain and corrosion on every elevation. That is the pattern across most of the county, though an individual property can differ.

Send us your sizes.

A written price, a real date, and no one turning up at your house.

Call WhatsApp Get a price