Aluminium doors supplied to Cardiff
Yes — aluminium entrance, French and Crittall-style doors are supplied to Cardiff supply only, made to your structural opening and delivered in about a week against an industry norm of 8–12 weeks. Fitting is available separately.
66 designs, made to your opening sizes and delivered 2–3 working days once made into Cardiff — 115 road miles from where they are built. Installation available and priced separately.
Specification
| Leaf | Thermally broken aluminium, 60–70mm |
| Locking | Multipoint, TS007 rated cylinder |
| Threshold | Low-threshold and Part M compliant options |
| Finish | Polyester powder coat, any RAL, dual colour available |
| Glazing | 28mm toughened sealed unit |
| Security | PAS 24 tested constructions available |
| Guarantee | 10 years on the leaf and frame |
| Designs held | 66 |
| Delivery to Cardiff | Zone C — 2–3 working days once made |
Why this suits Cardiff
An aluminium door holds its shape where a timber one moves and a uPVC one sags. In Cardiff the practical gain is on severn estuary exposure with mild.
Victorian and Edwardian terraces, interwar suburbs, and modern waterfront flats. Severn estuary exposure with mild, wet westerlies. The failure that tends to come first is Rot in original timber sashes and damp in solid-wall terraces — worth knowing before you decide between repairing what you have and replacing it.
Welsh building regulations differ from England — confirm the target U-value before ordering. Order to the structural opening, measured in three places, smallest figure wins. How to measure properly.
Also supplied to Cardiff
Aluminium doors in Cardiff — questions
Can I get a price without giving you my details?
Prices are published on the product pages with an inc and ex VAT switch. For your exact sizes we need to price it, but you can see the range before you speak to anyone.
What if the delivery is damaged?
Check it on the vehicle and note anything on the paperwork before the driver leaves. Damage reported at that point is replaced; damage found a fortnight later is much harder to resolve.
How long does delivery to Cardiff take?
About a week from order for standard products in standard finishes, then 2–3 working days once made for the run to Cardiff. Special RAL colours and made-to-measure joinery take longer, and you get a firm date before you pay.
Do you install in Cardiff?
Installation is available and quoted as a separate line, so you can see exactly what the fitting costs against the product. The product still arrives on the supply-only lead time; the fitting date depends on the diary.
What size do I order to?
The structural opening — brick to brick, lintel to cill. Measure in three places and use the smallest figure. Do not take a fitting tolerance off yourself; that is done at our end.